Services

Home Additions

An addition ties new structure into an existing house without it ever looking like an afterthought. We manage the survey, engineering, permits and the trades so the new space matches the old in roofline, finish and feel.

What’s typically included

  • Rear and side additions / bump-outs
  • Second-storey additions
  • Garage conversions and above-garage rooms
  • In-law and secondary suites
  • Foundation, framing, roofing and exterior tie-in
  • Engineering, permits and inspections coordinated for you

Good to know

How long does an addition take?

Most residential additions run three to six months on site once permits are issued, depending on size and foundation type. We give you a stage-by-stage schedule before we start.

03 — How it runs

A clear path from first visit to final walk-through.

  1. 01

    Consultation

    We visit the property, look at what you want to change, and talk through what is realistic for the space and the budget.

  2. 02

    Scope & estimate

    You get a written scope that lists exactly what is included, the materials assumed, and a price with no vague line items.

  3. 03

    Drawings & permits

    Where the work needs them, we prepare drawings and pull the permits, and book the engineering and inspections.

  4. 04

    Build

    One site lead runs the trades to a schedule you can see. You get regular updates and a clean site at the end of each week.

  5. 05

    Walk-through & warranty

    We finish the punch list with you, hand over manuals and warranties, and stay reachable after the job is done.

Ready to talk home additions?

Send the details and get a written estimate — no pressure, no fee.